2025–2026 project
Cathodic protection of the Gazli — Sarimay trunk gas pipeline
Electrochemical protection against corrosion of the 54 km Gazli — Sarimay trunk gas pipeline in Bukhara Region.
- Region
- Bukhara Region
- Status
- 2025–2026 project
- Length
- 54 km
- Work type
- Cathodic protection
- Client
- JSC Uztransgaz
