0.4–500 kV

GRIDCON ENERGY projects: substations and power lines

Substations, power lines and networks across Uzbekistan: completed before 2025, under way in 2025–2026 and in design for 2026–2027.

GRIDCON ENERGY projects on a 3D map of Uzbekistan
436.3MVAsubstation capacity on our projects
236.6kmof 110–220 kV lines built before 2025
16projects in the portfolio

16 projects

2025–2026 project

Iyk Ota 110/35/10 kV substation and 110 kV cable line

New build, 80 MVA, EPC · Tashkent City

Learn more
2025–2026 project

Nurabad — Khalqa 500 kV overhead line

Double-circuit, 40 km, EPC · Samarkand Region, Jizzakh Region

Learn more
2025–2026 project

Reconstruction of five Tashkent substations

35–110 kV, 356.3 MVA, EPC · Tashkent City

Learn more
2025–2026 project

Sagbon — Tashmi 35 kV cable line

35 kV cable line, 53 km · Tashkent City

Learn more
2025–2026 project

Power supply for the main fountain of New Tashkent

35/0.4 kV distribution substations, commissioning · Tashkent City

Learn more
2025–2026 project

Cathodic protection of the Gazli — Sarimay trunk gas pipeline

Cathodic protection, 54 km · Bukhara Region

Learn more
In design 2026–2027

220 kV overhead line, 134 km (REMIT)

World Bank project, Fergana Valley · Fergana Region, Andijan Region

Learn more
In design 2026–2027

Sherabad substation — QUMTEX INVEST 35 kV switchyard line

35 kV overhead line, new project · Surkhandarya Region

Learn more
Completed before 2025

Guzar-500 — Amir Temur (Azamat) 220 kV line

Double-circuit, 59.6 km · Kashkadarya Region

Learn more
Completed before 2025

Power supply for traction substations of the Pap — Namangan — Andijan railway

110 kV line and 220 kV in-out, 54 km · Namangan Region

Learn more
Completed before 2025

Chupon Ota 220 kV substation expansion and 220 kV line

Transformer T-5, 220 kV line, 40 km · Samarkand Region

Learn more
Completed before 2025

Turakurgan TPP — Yulduz substation 220 kV line

220 kV, 26 km · Namangan Region

Learn more
Completed before 2025

Navoi TPP — Khimiya substation 220 kV line

220 kV, 27 km · Navoi Region

Learn more
Completed before 2025

Syrdarya TPP — Pechnaya, Metallurgiya substations 220 kV line

220 kV, 30 km · Syrdarya Region

Learn more
In design 2026–2027

Power networks of Surkhandarya Region

Power network facilities · Surkhandarya Region

0.4–35 kV networks
In design 2026–2027

Power networks of the Republic of Karakalpakstan

Power network facilities · Republic of Karakalpakstan

0.4–35 kV networks