Completed before 2025

Guzar-500 — Amir Temur (Azamat) 220 kV line

Construction of the 59.6 km double-circuit Guzar-500 — Amir Temur (Azamat) 220 kV overhead line in Kashkadarya Region.

Region
Kashkadarya Region
Status
Completed before 2025
Length
59.6 km
Voltage
220 kV, double-circuit
Client
NEGU JSC
Guzar-500 — Amir Temur (Azamat) 220 kV line on a 3D map of Uzbekistan