Completed before 2025
Guzar-500 — Amir Temur (Azamat) 220 kV line
Construction of the 59.6 km double-circuit Guzar-500 — Amir Temur (Azamat) 220 kV overhead line in Kashkadarya Region.
- Region
- Kashkadarya Region
- Status
- Completed before 2025
- Length
- 59.6 km
- Voltage
- 220 kV, double-circuit
- Client
- NEGU JSC