2025–2026 project
Nurabad — Khalqa 500 kV overhead line
Construction of a double-circuit 500 kV overhead line between the Nurabad and Khalqa 500/220 kV substations: foundations, erection of towers, conductor, earth wire and OPGW, commissioning.
- Region
- Samarkand Region, Jizzakh Region
- Status
- 2025–2026 project
- Length
- 40 km
- Voltage
- 500 kV
- Client
- ACWA Power (Sazagan Solar)
- Contract
- EPC

Scope of work
- Foundations
- Tower erection
- Conductor stringing
- Earth wire and OPGW
- Commissioning